CASE STUDY 1

Request to design a solution for a block of flats which had an issue with flooding in the bathroom areas. The slot in the floor was 50mm x 50mm and the remaining components sat beneath the concrete. The tube was made of copper welded in the base to take it to an outside wall.  

Round Table BBQ
Round Table BBQ

CASE STUDY 2

 

A special sit around BBQ failed to comply to New Zealand safety standards and could not be sold in New Zealand until it complied. We were asked to make the correct sized jets so the BBQ could conform to New Zealand standards.

CASE STUDY 3

 

Crox tools large 25mm to 50mm and inc 65mm. We were able to forge the large body on our 200 tone press and machined at Barclay's Engineering.